PROMAN MES: production data captured where it is created

The MES for manufacturing companies: progress, times, downtime and scrap declared from shop-floor stations and available in the office straight away.

In many manufacturing companies progress is known by word of mouth and actuals are reconstructed at the end of the month, when correcting things no longer helps. The result is familiar: lead times estimated by eye, approximate job order costs, delays discovered by the customer before management.

A MES (Manufacturing Execution System) solves the problem at the root: the data is recorded when the event happens, from the station where it happens. PROMAN is the system we use for production data capture in manufacturing companies, with stations designed for the shop floor — few operations, a legible interface, usable even with your hands full.

The MES does not live on its own: it takes production orders from the management system, returns progress and consumption, and feeds job order actuals and management dashboards. Where there is an APS, it provides the real picture of the shop floor on which to recalculate the plan.

What it captures and what it gives back

Production progress

Start and end of an operation, quantities produced, conforming pieces and scrap, declared directly by the operator.

Times and downtime

Set-up and cycle times, machine downtime with reason codes agreed with the department heads, recurring micro-stoppages.

Industry 4.0 connectivity

Automatic acquisition of counts and statuses from suitably equipped machines, with no double keying.

Documentation at the station

Drawings, routings and work instructions available at the bench, always in the correct revision.

Materials and receipts

Withdrawals, receipts into the warehouse and traceability of batches and serial numbers linked to the production operations.

Shop-floor indicators

Efficiency, saturation, scrap and punctuality: the same figures for the shift leader and for management.

How to get it accepted on the shop floor

A MES perceived as surveillance gets worked around

It is the most important lesson we have learned in the field. If declaring costs time, or if the data only serves management, operators will record the bare minimum, often at the end of the shift — and the data loses its value.

That is why we set up the stations so that they give something back to the people using them: how much is left to finish the batch, which stoppages keep repeating, where time is lost in set-up. The MES becomes a shop-floor tool, and the data arrives clean.

Prerequisites

  • item master data and bills of materials aligned with actual production;
  • routings whose operations match what is actually declared;
  • a short, shared list of downtime reason codes;
  • stations reachable on the network, sized for the department;
  • an internal contact who follows the start-up together with us.

Go-live

How we bring the MES into the company

We always start from a pilot line: a few weeks to understand how the department really works and to correct things before extending.

  1. Department analysisFlows, stations, ways of declaring that are sustainable for the operators.
  2. Technical dataChecking and aligning routings, operations and reason codes with the engineering office and production.
  3. Pilot lineInstallation of the first stations, short training, close support during the first shifts.
  4. ExtensionRoll-out to the other departments with the corrections learned on the pilot.
  5. Integration and dashboardsConnection with the management system, job order actuals and shared indicators.

Would you like to know what a job order really costs?

The MES is the starting point. We come and see the shop floor and tell you what is needed, and in what order.