Cyberplan: planning production with the real constraints

We are value-added resellers (VAR) of Cyberplan, the APS by Cybertec — a company of the Zucchetti group — for finite-capacity planning and scheduling.

A traditional MRP calculates requirements assuming the work centres are always available. In reality machines have shifts, set-ups, maintenance and queues: that is why the dates promised to the customer then have to be defended with invented safety margins.

Cyberplan is the APS (Advanced Planning & Scheduling) developed by Cybertec, a software house from Trieste active since 1991 and today part of the Zucchetti group. It works alongside the ERP — and the MES, where there is one — simulating production flows to identify critical points before they appear on the shop floor.

We are a Cyberplan VAR: we do not stop at supplying the licences. We check the technical data you start from, configure the planning model around your real constraints, connect the APS to the management system and train the people who will use it every day.

What Cyberplan does

Finite capacity

Plans built on machines, shifts, set-ups and material availability: what comes out is executable, not theoretical.

Detailed scheduling

Sequences by work centre optimised to reduce set-up times and respect commercial priorities.

“What if” simulations

What happens if I bring forward an urgent job, if a machine stops, if the supplier delivers late: the answer before you decide.

Materials and procurement

Requirements aligned with the executable plan, highlighting the shortages that would stop production.

Bottlenecks

Loads by work centre and saturation: where it is worth investing, where it is worth subcontracting.

Sales & Operation Planning

Comparison between sales forecasts and production capacity over medium and long horizons, for budget and headcount decisions.

What changes in the company

The value is not the plan: it is the promise you can keep

  • Sales staff can confirm a date without phoning production.
  • Urgent jobs are inserted knowing the impact on the other orders.
  • Purchasing follows the real plan, not a theoretical requirement.
  • Shop-floor loads are visible before they turn into delays.
  • Decisions on shifts, overtime and subcontracting are taken on the figures.

When Cyberplan is not (yet) needed

We say so up front, because it is the most frequent cause of disappointing projects: if bills of materials and routings do not reflect what is actually produced, an APS will return plans that are precise and wrong.

In those cases we suggest starting by putting the technical data in order and with shop-floor data capture: advanced planning comes afterwards, and then it works.

Go-live

How we bring Cyberplan into the company

An APS project is a project about data and method before it is about software. This is our typical path.

  1. Analysis of the production modelType of production, constraints, critical resources, priority rules actually used.
  2. Checking the technical dataBills of materials, routings, times, work centres and calendars: cleansed where needed.
  3. Configuring the modelBuilding the planning model and connecting it with the ERP.
  4. Comparing plan and realityA period of close support in which the plan is checked against what happens on the shop floor.
  5. Full operationTraining of the planners, indicators of punctuality and saturation, periodic review of the model.

Would you like to understand whether an APS is the right answer?

We start with a check of your production data: in a few days it becomes clear whether the project is ready to start.