APS scheduling
With Cyberplan: finite-capacity plans that consider machines, set-ups, shifts and materials, with “what if” simulations.
Manufacturing and supply chain
Technical data in order, data capture on the shop floor, finite-capacity planning and a traced warehouse: the sequence that makes times and costs reliable.
APS scheduling
A traditional MRP assumes the work centres are always available. An APS such as Cyberplan — for which we are value-added resellers — reasons differently: it starts from the actual capacity, the set-ups, the shifts and the materials available and builds an executable plan.
An APS returns useful plans only if the basic data is in order. Before installing anything we check together:
Logistics and warehouse
With locations, radio-frequency terminals and guided picking the warehouse stops being the place where data gets lost.
The operator follows the routes and quantities indicated by the system, with confirmation by barcode scan.
Batches, serial numbers and expiry dates traced on the way in and the way out, for supply-chain traceability and recalls.
Cycle counts without stopping the warehouse, with differences analysed by cause.
Go-live
In production the order of the steps is everything: first the basic data, then data capture, and finally advanced planning. Skipping the first step is the fastest way to lose confidence in the system.
We start with a check of your existing production data and indicate the shortest route to get there.